Energy storage · BESS

Your equipment is global. The installation is local.

Engineering, tropicalisation, installation and commissioning of battery storage in Brazil — for manufacturers entering the market and for capacity auction projects.

The market

Under 200 MW installed. 8 to 15 GW projected by 2030.

Brazil has less than 200 MW of battery storage installed and no utility-scale project in operation. Projections put the country at 1–2 GW in 2027 and 8–15 GW by 2030.

The trigger is LRCAP 2026, the country's first capacity reserve auction for storage: auctions on 2 and 4 December 2026, 15-year contracts, supply starting 1 August 2028. Minimum 30 MW, four hours of operation, six-hour recharge, 85% minimum efficiency, grid-forming required.

Manufacturers from around the world are entering. All of them hit the same wall: who does the engineering and the labour on the ground.

The clock

  • Oct 2026 — engineering and procurement window opens
  • Technical qualification and connection studies
  • Environmental licensing
  • Apr–Aug 2027 — construction and assembly
  • Apr 2028 — commissioning and testing
  • 1 Aug 2028 — supply begins

Container lead times currently run 14 to 18 months. Engineering decided after December 2026 enters a compressed schedule.

For manufacturers and integrators

What tropicalisation actually means here

Thermal design for the temperatures and humidity your containers will really see. Corrosion protection for the saline environment along the north-eastern coast. Dust sealing. A review of the HVAC design against local ambient conditions.

And the part that costs most when it is missing: navigating a regulatory framework that is still forming. Brazil's storage law dates from 2025, the concession rules from June 2026, the main technical standard — ABNT NBR 17153 — has been under revision since February 2026, and the IEC 62933 series is still being translated.

For a company arriving from outside, that is a moving target. Following it and turning it into design requirements before the container leaves the factory is part of the job.

What we provide locally

  • Thermal, corrosion and ingress design review
  • Regulatory tracking and technical documentation in Portuguese
  • Grid code and grid-forming compliance support
  • Installation, assembly and commissioning with our own crews
  • After-sales, technical assistance and O&M with local presence
  • Local content support for the domestic auction product

The group has integrated 175+ MW of storage.

Also for project owners

Full EPC for storage projects

Engineering

  • Connection studies and qualification support
  • Environmental licensing support
  • Detailed design: civil, electrical, protection and control
  • Technical specification and procurement support

Construction

  • Civil works, piling and foundations
  • Electromechanical assembly
  • MV and LV networks and substation
  • Integration to the connection point

Operation

  • Commissioning and performance testing
  • Entry into commercial operation
  • O&M and monitoring
  • Support across the 15-year contract

Get in touch

Twenty months go quickly

If your project has a contractual delivery date, what decides it is not the equipment — it is when engineering starts. Tell us what is already defined and we will give you an honest read on schedule.

  • 175+ MW of storage integrated by the group
  • Own crews for civil works, MV/LV, substation and commissioning
  • Continuous tracking of Brazil's evolving storage regulation

Prefer to talk?
Leave your number in the form and we will call you.
comercial@oneenergybrasil.com.br

Talk to engineering

Tell us the equipment, the site or the deadline. We answer with what is executable.

We use your information only to respond to this enquiry, under Brazil’s General Data Protection Law (LGPD). See our privacy notice.